CHARGER REPLACEMENT & UPGRADE
Modernising an apartment charging system — fast EV charging and cost-saving load management
Halliday House & Cheevers Court
0
Chargers upgraded
0
Distribution boards load-managed
22kW
3-phase smart charging
Garo
Entity Pro chargers
THE CHALLENGE
The apartment scheme at Halliday House & Cheevers Court had an ageing set of EV chargers spread across multiple distribution boards, with no proper load management and inconsistent operation. The owners wanted a clean, reliable, modern system that the management company could actually oversee and control.
THE SOLUTION
- 16 chargers replaced with Garo Entity Pro — modern 3-phase 22kW smart chargers, reusing the existing posts, cabling and comms where possible.
- Proper load management added — load-interface units and CTs fitted across all six distribution boards feeding the chargers.
- A consistent, controlled system — unused points secured and standardised so the car park is clean and manageable.
- Full oversight for management — monitoring, control and reporting across the whole charging estate.
THE RESULTS
- 16 modern smart chargers installed and operational.
- Load management across 6 distribution boards — safe, balanced charging.
- A consistent, controlled car park that's easy to manage.
- Reused existing infrastructure to keep the upgrade cost-effective.

WHY THE APPROACH WORKS
Early apartment charging was often installed without the load management and oversight a shared system needs. By replacing the old chargers with modern smart units and adding proper load management across every board, GEV turned an inconsistent setup into a reliable, controllable system — while reusing existing infrastructure to keep the cost down.
Thinking about EV charging for your development?
We survey your site, model the grant-funded cost and handle the SEAI application end to end.