GEV High-Impact Projects

    Real results for Irish fleets and communities

    From cutting fleet admin costs to future-proofing apartment charging, see how GEV's EV infrastructure delivers measurable savings and emissions reductions.

    Vhi logo
    Fleet Home Charging

    How Vhi saved €239 per driver, per month on admin

    Vhi electrified its commercial fleet expecting fuel savings — and found an even bigger saving on administration with GEV's Home Charge solution.

    €239
    Saved per driver / month on admin
    75%
    Reduction in fleet CO₂
    Addison Park Apartments – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    Visitor-bay charging that's built to double on demand

    GEV delivered 8 charger-ready bays for Addison Park, with pre-cabled blanks that double capacity in minutes — and maximum SEAI grant secured.

    8
    Bays cabled & charger-ready
    80%
    SEAI grant on infrastructure
    Bastion Quay, Athlone – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    All 51 parking bays made EV-ready — while maximising the SEAI grant

    Bastion Quay in Athlone cabled all 51 bays on day one with 13 live chargers and a supply built to scale to 101 chargers with 80% grant support.

    51
    Bays cabled & charger-ready
    80%
    SEAI grant secured
    Clongriffin, Dublin 13 – EV charging installation by GEV Technologies
    Charger Replacement & Migration

    When the EO platform shut down, residents never lost service

    GEV migrated Clongriffin block-by-block from discontinued EO units to Easee 22kW chargers with zero resident downtime.

    Zero
    Downtime for residents
    6/bld
    Easee 22kW chargers per block
    Collegefort & Collegewood, Castleknock – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    EV charging across 3 car parks through a full ESB substation upgrade

    Two adjoining developments in Castleknock delivered 17 chargers across 3 car parks by coordinating an ESB substation upgrade end to end.

    17
    Chargers across 3 car parks
    80%
    SEAI infrastructure grant
    Halliday House & Cheevers Court – EV charging installation by GEV Technologies
    Charger Replacement & Upgrade

    Modernising an apartment charging system — Garo Entity Pro

    Upgraded 16 ageing chargers across 6 load-managed distribution boards, providing safe, balanced 3-phase 22kW charging with full oversight.

    16
    Chargers upgraded to Garo
    6
    Distribution boards managed
    Neptune Apartments, Honeypark, Dún Laoghaire – EV charging installation by GEV Technologies
    EV Multi-Unit Charging

    14 bays ready, six live — smart charging at Neptune, Honeypark

    Neptune cabled 14 bays with 6 live Easee chargers and 8 blanks, balanced across multiple cores with 4G/Wi-Fi boosters for seamless app control.

    14
    Bays cabled & charger-ready
    80%
    SEAI grant on infrastructure
    Seabrook Manor, Portmarnock – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    21 bays future-proofed — through an ESB substation upgrade

    Seabrook Manor in Portmarnock cleared its maxed-out ESB supply bottleneck with a coordinated substation upgrade, cabling 21 bays with 10 live chargers.

    21
    Bays cabled & charger-ready
    80%
    SEAI grant on infrastructure
    Smithfield Market, Dublin 7 – EV charging installation by GEV Technologies
    Mixed-Use & Commercial Charging

    17 chargers, three underground levels, four kinds of drivers

    Smithfield Market powers 17 chargers across 3 underground floors with 140kVA supply, day-to-night role switching and cell boosters where signal was zero.

    17
    Chargers over 3 underground levels
    140
    kVA dedicated EV supply
    Strandview, Bray – EV charging installation by GEV Technologies
    Residential & Commercial Charging

    A whole development future-proofed — residents and commercial on one network

    Strandview in Bray pre-cabled 34 bays across underground and surface parking, connecting residential and commercial units on a single managed network.

    34
    Bays pre-cabled & ready
    80%
    SEAI grant on infrastructure
    The Casino Apartments, Malahide – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    12 bays, 12 smart chargers — a full apartment car park electrified

    The Casino in Malahide electrified its entire car park with 12 Easee 22kW chargers on dual posts, an MIC upgrade and maximum SEAI grant support.

    12
    Bays with smart chargers
    22kW
    Fast AC charging
    The Pavilion Apartments, Dún Laoghaire – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    All 101 parking bays made EV-ready — with the maximum SEAI grant

    The Pavilion in Dún Laoghaire cabled all 101 bays with a dedicated new ESB supply, 22 live chargers and minutes to activate any future bay.

    101
    Bays cabled & charger-ready
    80%
    SEAI grant secured on infrastructure
    Wingfield Apartments, Stepaside – EV charging installation by GEV Technologies
    Apartment & Multi-Unit Charging

    Six chargers in — and the groundwork to reach sixty

    Wingfield Apartments installed 6 live chargers, 6 pre-cabled blanks and scalable backbone infrastructure across three car parks to reach 60 chargers with 80% SEAI grant.

    6
    Chargers live today
    60
    Designed to scale to