Real results for Irish fleets and communities
From cutting fleet admin costs to future-proofing apartment charging, see how GEV's EV infrastructure delivers measurable savings and emissions reductions.

How Vhi saved €239 per driver, per month on admin
Vhi electrified its commercial fleet expecting fuel savings — and found an even bigger saving on administration with GEV's Home Charge solution.

Visitor-bay charging that's built to double on demand
GEV delivered 8 charger-ready bays for Addison Park, with pre-cabled blanks that double capacity in minutes — and maximum SEAI grant secured.

All 51 parking bays made EV-ready — while maximising the SEAI grant
Bastion Quay in Athlone cabled all 51 bays on day one with 13 live chargers and a supply built to scale to 101 chargers with 80% grant support.

When the EO platform shut down, residents never lost service
GEV migrated Clongriffin block-by-block from discontinued EO units to Easee 22kW chargers with zero resident downtime.

EV charging across 3 car parks through a full ESB substation upgrade
Two adjoining developments in Castleknock delivered 17 chargers across 3 car parks by coordinating an ESB substation upgrade end to end.

Modernising an apartment charging system — Garo Entity Pro
Upgraded 16 ageing chargers across 6 load-managed distribution boards, providing safe, balanced 3-phase 22kW charging with full oversight.

14 bays ready, six live — smart charging at Neptune, Honeypark
Neptune cabled 14 bays with 6 live Easee chargers and 8 blanks, balanced across multiple cores with 4G/Wi-Fi boosters for seamless app control.

21 bays future-proofed — through an ESB substation upgrade
Seabrook Manor in Portmarnock cleared its maxed-out ESB supply bottleneck with a coordinated substation upgrade, cabling 21 bays with 10 live chargers.

17 chargers, three underground levels, four kinds of drivers
Smithfield Market powers 17 chargers across 3 underground floors with 140kVA supply, day-to-night role switching and cell boosters where signal was zero.

A whole development future-proofed — residents and commercial on one network
Strandview in Bray pre-cabled 34 bays across underground and surface parking, connecting residential and commercial units on a single managed network.

12 bays, 12 smart chargers — a full apartment car park electrified
The Casino in Malahide electrified its entire car park with 12 Easee 22kW chargers on dual posts, an MIC upgrade and maximum SEAI grant support.

All 101 parking bays made EV-ready — with the maximum SEAI grant
The Pavilion in Dún Laoghaire cabled all 101 bays with a dedicated new ESB supply, 22 live chargers and minutes to activate any future bay.

Six chargers in — and the groundwork to reach sixty
Wingfield Apartments installed 6 live chargers, 6 pre-cabled blanks and scalable backbone infrastructure across three car parks to reach 60 chargers with 80% SEAI grant.