    THE CHALLENGE

    Seabrook Manor's underground parking sits behind two ESB substations that were both already at maximum capacity — a hard stop for any new EV charging. The managing agent wanted charging for the whole development, which meant solving the supply problem before a single charger could go in.

    THE SOLUTION

    • New ESB connection & substation upgrade — GEV applied for a new connection and coordinated the upgrade of the north-side substation so the development had capacity.
    • Full infrastructure for 21 bays — 10 live Easee 22kW chargers plus 11 pre-cabled blanks — the whole car park ready at once.
    • Dedicated cabinet with smart balancing — an Easee equaliser sharing load and phase dynamically across all three phases.
    • Grant handled for the OMC — the SEAI application prepared and submitted, with the ESB works covered by the grant.

    THE RESULTS

    • 21 bays cabled and charger-ready — the disruptive work done once.
    • 10 chargers live, with 11 blanks ready to activate in minutes.
    • The supply bottleneck cleared — a new ESB connection and substation upgrade delivered.
    • Expandable toward 100 chargers as resident demand grows.
    Seabrook Manor, Portmarnock – EV charging installation by GEV Technologies

    WHY THE APPROACH WORKS

    The costly part of apartment charging is the shared infrastructure, not the chargers themselves — and a maxed-out ESB supply is where most projects stall. By clearing the supply constraint and cabling all 21 bays up front, Seabrook Manor can add chargers in minutes as residents switch, and scale toward 100 without starting over.

    Thinking about EV charging for your development?

    We survey your site, model the grant-funded cost and handle the SEAI application end to end.