Wingfield Apartments, Stepaside – EV charging installation by GEV Technologies
    APARTMENT & MULTI-UNIT CHARGING

    Six chargers in — and the groundwork to reach sixty

    Wingfield Apartments•Stepaside
    0
    Chargers live today
    0
    Blanks pre-cabled & ready
    0%
    SEAI grant on infrastructure
    0
    Designed to scale to

    THE CHALLENGE

    Wingfield's parking is split across three separate areas, each on a different landlord supply — a layout that would normally cap EV charging almost immediately. The brief was to install charging now and future-proof it, without an expensive supply upgrade for demand that hadn't arrived yet.

    THE SOLUTION

    • Charging across three locations — two underground car parks and above-ground parking, all on one managed network.
    • Six live, six blanks pre-cabled — each blank needs only a Chargeberry dropped in to go live — no new wiring, no specialist installer.
    • A supply sized to grow — a dedicated EV distribution board with headroom, ready to move to its own ESB supply as demand rises.
    • Designed to scale to 60 — the infrastructure is laid out to reach up to 60 charge points over time.

    THE RESULTS

    • 6 chargers live today across three separate parking areas.
    • 6 blanks pre-cabled and ready — each activates in minutes.
    • Maximum SEAI grant secured on the infrastructure.
    • A clear path to 60 chargers without starting the groundwork over.

    WHY THE APPROACH WORKS

    The costly part of apartment charging is the shared infrastructure, not the chargers themselves. By cabling blanks into every location up front and sizing the supply to grow, Wingfield can add chargers in minutes as residents switch — and scale all the way to 60 without starting over.

    Thinking about EV charging for your development?

    We survey your site, model the grant-funded cost and handle the SEAI application end to end.